However, provisions for local operation will be provided for maintenance, testing and for operation during the period required to construct Foster Powerhouse. 6.02 Plan of Operation - The main units will be used for power generation and as synchronous condensers. The powerhouse will be operated manually at the site until the completion of Foster Powerhouse. Then, supervisory equipment will allow remote control of Green Peter Powerhouse from Foster Powerhouse. a. Manualanbsp;...
Title | : | Green Peter Reservoir, Middle Santiam River, Oregon: Powerhouse and switchyard; preliminary design report [and [suppl] 1. Powerhouse; structural and architectural design. [suppl] 2. Powerhouse; mechanical design. no. 13. Fish facilities |
Author | : | United States. Army. Corps of Engineers |
Publisher | : | - 1962 |